Great Sample Resume

DC Power Installer Resume

When writing a DC Power Installer Resume remember to include your relevant work history and skills according to the job you are applying for. Whether you're seeking an entry-level position or have been in your career for a few years, exposing your relevant achievements in your resume can allow you to stand out and get that job interview.

This resume example is a great representation of what a hiring manager is looking for in a DC Power Installer Resume. Feel free to use this example for reference as you create your own resume or use this easy resume builder that will guide you through every step of your building your resume in just a few minutes.

Here is the DC Power Installer Resume example:

Leonardo Mayes

3616 Rockford Mountain Lane

Oshkosh, WI 54901

(555)-555-5555

[email]

Job Objective To obtain a full-time position as DC Power Installer in which to use my skills to their fullest potential.

Summary of Qualifications:

  • Strong experience with installation of various DC Power systems
  • Sound knowledge of the DC power and batteries along with chargers and power boards
  • Deep knowledge of power, testing equipments and various fire extinguishing systems
  • Familiarity with DC power plants, BDFB, inverters, power cable and lug crimping
  • Ability to comprehend the technical specifications and other manuals
  • Ability to diagnose the problems and resolve it

Work Experience:

DC Power Installer, April 2008 – Till Date

ADC Telecommunications, Oshkosh, WI

  • Prepared documents of the installations by labeling the equipments.
  • Designed the installation of the power systems with the help of various manuals and design plans.
  • Facilitated the installation by preparing a diagram of the work to be carried on the site and gathered the various equipments and tools needed for the same.
  • Performed regular checks on the power with the help of the testing equipments, fire suppressing systems and the alarms. Resolved any malfunction.
  • Installed the peripherals of the power systems such as engines, power boards, fuse bays and power cables.
  • Performed all the installation process according to the industry standards.

DC Power Installer, January 2004 – March 2008

CACI International, Oshkosh, WI

  • Performed preventative maintenance on the operation to ensure uninterrupted supply of power.
  • Maintained the equipment by performing regular troubleshooting by repairing any malfunctions and then carrying back up tests.
  • Prepared documents for all the maintenance and installation work carried out in the office.
  • Maintained the inventory of the materials and placed orders in accordance to the same, verified the inventory with the receipts of the product.
  • Attended many educational seminars and read technical magazines to keep oneself updated with the latest technologies.

Education

Associate Degree in Electronics, Jackson State Community College, Jackson, TN

  • 1.0.0Version
  • --Download
  • 1File Count
  • March 1, 2024Create Date
  • March 1, 2024Last Updated

Average Rating

Be the first one to review